Installation Guide

Single Storage   Item#: 10021     (click to see large pictures)

 

Tools recommended for the installation

Hardware: 28 wood dowels, 18 2" screws, 6 cam-lock pins, 6 cam-lock caps, 5 small screws .

check all the packed boards: (from left) 3 Vertical Boards (VB), 1 Right Side Board (RSB), 1 Left Side Board (LSB)

check all the packed boards: (from left) 1 Toe-kick Base Board (TBB), 1 Top Horizontal Boards (THB), 1 Middle Horizontal Boards (MHB), 1 Bottom Horizontal Boards (BHB)

 

 

identify the horizontal boards from other side: (from left) Top Horizontal Boards (THB), Middle Horizontal Boards (MHB), 1 Bottom Horizontal Boards (BHB)

1 Back Board (BB)

drop wood glue in the holes for wood dowels on the end of all 3 Vertical Boards (VB)

place wood dowels in the holes for wood dowels (middle)

 

pay attention to the size of the holes for wood dowels

 

hammer the wood dowels all the way into the holes

 

 

 

Warning: Make sure to hammer the wood dowels all the way into the vertical boards, (leaving about 3/8” out), to avoid damaging the Horizontal Boards.


* Learningground is not liable if the installer misses this step.

 

 

 

do the same at the other end of the Vertical Boards (VB)

 

 

 

lay the Top Horizontal Board (THB) on a table. The Top Horizontal Board board is the one with no holes on one side

turn the THB to the other side. there are 2 holes (middle) for wood dowels, and 2 holes for cam-lock pines.

install 4 cam-lock pins by hand and fasten the pins with a screwdriver

Warning: never hammer wood dowels directly on Horizontal Boards, to avoid damaging the board from other side.

* Learningground is not liable if the installer misses this step.

drop wood glue in the holes for wood dowels

install one of the Vertical Boards (VB) by lining up the holes with the cam-lock pins

gently push the board down with hand

install the other Vertical Board

install the cam-lock caps

 

 

install the cam-lock caps and secure them with a screwdriver

 

drop glue on the tips of the wood dowels on the Vertical Boards

lineup the wood dowels in the holes of the Middle Horizontal Board (MHB)

gently push or hammer the Middle Horizontal Board (MHB) with a mallet

insert 4 2" screws in the holes

Fasten the 2" screws with the wrench (supplied)

or a power screwdriver

 

 

install 2 cam-lock pins on Middle Horizontal Board (MHB) as you did with the THB before

drop wood glue in the holes for wood dowels

install the last Vertical Boards (VB) by lining up the holes with the cam-lock pins

install the cam-lock caps and secure them with a screwdriver

drop glue on the tips of the wood dowels on the Vertical Board

 

place Bottom Horizontal Board (BHB) on the Vertical Board, lineup the wood dowels in the holes of the MHB.

insert 2 2" screws in the holes

Fasten the 2" screws with the wrench (supplied)

or a power screwdriver

turn the furniture side way on floor

hammer wood dowels to the Toe-kick Base Boards (TBB)

drop glue in the holes on BHB for the Toe-kick Base Board

install the Tor-kick Base Board (TBB)

drop glue in the holes for the wood dowels

insert the wood dowels

hammer the wood dowels all the way into the holes

Warning: Make sure to hammer the wood dowels all the way into the vertical boards, (leaving about 3/8” out), to avoid damaging the Horizontal Boards.
* Learningground is not liable if the installer misses this step.

drop glue in the holes for the wood dowels on both Right and Left Side Boards

 

Warning: never hammer wood dowels directly on Side Boards, to avoid damaging the board from other side.

* Learningground is not liable if the installer misses this step.

line up the Left Side Board with the wood dowels and slots for the back board

 

 

install the Side Board by lining up the holes with the wood dowels, and push with hand gently

 

 

insert 6 2" screws in the holes

fasten the 2' screws with wrench

... or a power screwdriver

turn the furniture to the other side

insert the Back Board (BB),

make sure the holes on the Back Board line up with the Vertical Boards

make sure the Back Board is all the way inside the slots

drop glue inside the holes for wood dowels

insert wood dowels in the holes

hammer the wood dowels all the way into the holes

Warning: Make sure to hammer the wood dowels all the way into the vertical boards, (leaving about 3/8” out), to avoid damaging the Horizontal Boards.
* Learningground is not liable if the installer misses this step.

make sure drop glue in the holes for the wood dowels on the Right Side Board

install the Right Side Board

insert the 6 2" screws

fasten the 2' screws with wrench or power screwdriver

 

 

turn the furniture on its base

secure the Back Board with the 5 small screws, by following the holes on the board

Finished product

The holes on the side boards are for the possibility of expanding your Single Storage to a Fold Storage unit (10022), if you purchase TWO of them.

 

You may order the extra hardware from Learningground.

 

 

The holes on the side boards are for the possibility of expanding your Single Storage to a Fold Storage unit (10022), if you purchase TWO of them.

 

You may order the extra hardware from Learningground.

 

The holes on the side boards are for the possibility of expanding your Single Storage to a Fold Storage unit (10022), if you purchase TWO of them.

 

You may order the extra hardware from Learningground.